Omega Center for Sustainable Living

Images

Click on a small image below to have it display larger above.
Click on the large image above to display the full sized image.

GENERAL INFORMATION

QUICK FACTS

Location:Rhinebeck, NY
Building Type:
  • Entertainment or Culture (e.g. Museum, Theater, Cinema, Sports Arena, Casino, Night Club)
  • Laboratory

PROJECT INFORMATION


Project Full NameOmega Center for Sustainable Living

Founded in 1977, the Omega Institute is the nation's largest holistic learning center. Their mission: "To look everywhere for the most effective strategies and inspiring traditions that might help people bring more meaning and vitality into their lives." In 2006 they set out to develop a new and highly sustainable wastewater filtration facility for their 195-acre campus, which is located within one of the most important watersheds in the world, the 13,400 square-mile Hudson River basin.
The primary goal for this project was to overhaul the organization's current wastewater disposal system by using alternative methods of treatment. As part of a larger effort to educate the client's visitors, staff, and local community on innovative wastewater strategies, they decided to showcase the system in a building that houses both the primary treatment cells as well as a classroom and laboratory. In addition to using the treated water for garden irrigation and in a greywater recovery system, they use both the system and building as a teaching tool in their educational program designed around the ecological impact of their system. These classes are offered to campus visitors, area school children, university students, and other local communities.

Project Owner:Omega Institute for Holistic Studies
Owner Type:Corporation, nonprofit

LOCATION & CLIMATE

City:Rhinebeck
State / Province:NY
Site context/setting:Rural

OCCUPANCY

Typical Number of Permanent Occupants:2
Owner Occupied:
Average Hours Per Permanent Occupant:20
Typical Number of Visitors Per Week:350

RATINGS & AWARDS

Award ProgramYearCategory/Title
AIA/COTE Top Ten Green Projects2010

VISITS & GUIDED TOURS

Visiting

It is possible to visit this project
Visiting Details:

The Omega Center for Sustainable Living is located at 125 Lake Drive in Rhinebeck, New York.

Touring

It is possible to tour this project
Tour Details:

Tours are available by appointment only.

PUBLICATIONS

TitleISBN ValuePublisherPublication Date
Omega Center for Sustainable Living (OCSL)

BUILDING DETAILS

SCOPE

GENERAL FLOOR AREA

Total Gross Floor Area6,200 ft²

BUILDING

Described project is a single building
This Building is Not Historic.

COMPLETION

DATE OF
OCCUPANCY/COMPLETION

May 2009

COMPLETION NOTES

ARCHITECTURAL DETAILS

SUSTAINABLE MATERIALS AND RESOURCES USED IN THE CONSTRUCTION AND LANDSCAPING

The architectural expression of materials is one of simplicity and transparency and is influenced by the colors and textures of the region. No effort was made to mask the underlying nature of a material, but rather to express its unique beauty. As a pedagogical and practical measure, interior finishes were reduced or eliminated. This honest approach helped reduce the overall embodied energy of the building and minimized potential off-gassing from various construction materials.

The OCSL facility is a showcase for salvaged materials and demonstrates how easily any building can take advantage of material reuse. Reclaimed materials used on the project include dimensional lumber, plywood, interior doors, beech wood paneling, and toilet partitions. (Materials came from warehouses, schools, office buildings, and other projects). All installed wood is either from an FSC-certified forest or a reclaimed source, including the plywood roof and wall sheathing, which was salvaged from the 2009 presidential inaugural stage. Materials were also sourced to avoid "Red List" materials from the Living Building Challenge Guidelines.

During construction, 99% of metal, cardboard, rigid foam, and wood scraps were recycled. All of food waste was composted, and 100% of glass, paper, and plastic packaging waste were recycled.

INDOOR ENVIRONMENT QUALITY

INDOOR ENVIRONMENT

Indoor Environment Issues

Daylighting, natural ventilation, and views are achieved through a system of operable, fixed, and solar-tracking fenestration. Operable windows are provided in each occupied space for both the health and enjoyment of guests, in addition to being part of the passive heating and cooling strategy for the building. Plants in the engineered biological wastewater treatment system remove carbon dioxide and other gases while producing oxygen-indoors and outdoors. Clerestory windows ventilate the lobby, mechanical room, and restrooms. Solar radiation heats the upper volume of air, and then natural buoyancy induces stack ventilation, which causes the air to push its way out of the open windows and pull in fresh, cooler air from lower windows in these spaces. Operable windows integrated into the south façade also allow for natural ventilation to assist in pushing hot air out of the building by channeling prevailing breezes that have been cooled while moving over the wetlands.

Building and site are integrated as a single system. The landscape produces a microclimate of clean air and beauty beneficial to the occupants. Water from the building feeds the plants and other living systems of the landscape. The two are visually connected by the transparency of each indoor space.

INDOOR ENVIRONMENT STRATEGIES SECTION

Comfort
Visual Comfort and The Building Envelope
  • Orient the floor plan on an east-west axis for best control of daylighting
  • Use large exterior windows and high ceilings to increase daylighting
  • Use skylights and/or clerestories for daylighting

DESIGN

DESIGN PROCESS

Process Design

PreDesign:
Predesign was underway prior to the design firm's involvement in the project; the general program was developed and the choice of engineered biological wastewater treatment system technology had been made. Through rigorous dialogue with the client, a clear vision emerged that included an expanded facility for education, a regenerative approach to the landscape, and a desire to meet the Living Building Challenge. The idea that the OCSL could be not only about cleaning the water of Omega's campus but also have an impact beyond their boundaries began to take shape.

Design:
The program was simple yet very important. Equally important was the opportunity to improve the first impression of the campus through the conversion of parking lots into gardens and creating a compact building dedicated to water. The team gathered during its first visit to the site and developed the site plan and original building concept during a two-day workshop. The concepts that emerged from that session remained intact throughout the process, though a significant change resulted as the design developed. The roof slope on the main building was reversed as a result of new information concerning solar energy needs for growing plants. In this case, the scientific process superseded our initial intuition for the massing and orientation of the building forms.

Construction Process:
There were three notable factors regarding the construction process. The client served as general contractor, with the support of a small construction firm. The remoteness of the site made sourcing materials and specialty technology services difficult. Material requirements for the Living Building Challenge and LEED Platinum target made procurement, and therefore the overall construction process, more complicated than usual.

Operations Maintenance:
Operating a Living Building with such a specific purpose is a learning experience. The team running the facility has to learn the systems and make seasonal adjustments. If the fans stop running condensation can accumulate quickly, so quick response time is required to avoid such conditions. The shift from automatic, operable windows to manual operable windows will require greater attention in operating the facility.

In House:
The commissioning process is ongoing. It is the team's expectation that, even though formal commissioning is complete, the building needs to operate through all four seasons and an annual campus cycle to fully tune the systems.

Measurement:
The building is in a one-year process of measurement and verification as part of the Living Building Challenge, which requires a full year of documented net-zero operations prior to certification. The results will be available in May 2010.

Design for Adaptability

Though the primary purpose of the building and site is cleaning water, its broader vision is to be a learning center that is adaptable for future pedagogical needs: a greenhouse supplying flowers for the campus and a research center dedicated to water and ecology systems. The classroom is designed for instructional classes related to water, yoga, and other programs offered on campus now and in the future. As a laboratory, the building and site are designed to embrace new technologies and emerging research. The landscape is planned as a research laboratory for native plants and water reclamation. In order to do these things the facility must be durable and live long as a result of all building systems. Materials requiring little or no maintenance were used throughout the facility due to the harsh exterior and interior (greenhouse) environments.

Inherent in the long-term view embraced by this project is the commitment to ecological wastewater treatment and renewable energy technologies. Each approach represents greater first cost investments than traditional technologies. These initial first cost investments will contribute to greater sustainability and longer lives, not only for this building, but for the Omega Campus and facilities as a whole.

LESSONS LEARNED

Discuss goals that were met and goals that were not achieved, and the reasons for these outcomes

The pioneering nature of this project has left the team with many lessons from the design and construction process. Many are the result of pursuing the Living Building Challenge and many others are products of the nature of the facility. A new lesson for this project was the complexity of finding materials that not only were not on the red list but also met radius and responsible industry requirements and were affordable for the client.

Our approach was an intuitive, scientific, and experiential process. Concepts were modeled using scientific tools to measure comfort, energy, daylighting and other metrics. The team collaborated and relied upon the findings of the modeling to develop an integrated, high-performance design for the building and site. One example was using water as a tempering element to improve comfort and reduce mechanical system capacity.

The OCSL is one of the first projects completed with construction that is designed and built to meet the Living Building Challenge. Its rigorous one-year performance verification period commenced in May; operations will be carefully monitored and evaluated by the Living Building Challenge. This process will optimally result in the building performing as designed and being awarded Living Building status.

FINANCES

GENERAL INFORMATION

Finances Description

Omega is an atypical owner. The decisions to use engineered biological wastewater treatment system technologies, renewable energy, and efficient building strategies are central to the mission of the organization. The decision to embrace those strategies, LEED Platinum certification, and the Living Building Challenge was approached without cost analysis-it was just the right thing to do.

Total Project Cost$2,800,000

FINANCE DETAILS

Estimated payback time of any investment in measures needed to reach zero net energy

Within the framework of these goals, efficient cost control was a constant challenge for the project, though it was treated somewhat typically in terms of project decision-making. The owner was extremely active in the design and construction process, becoming exceptionally knowledgeable about the costs of each item. Options were evaluated and decisions were made on the cost of every major building and landscape system. This process helped the team achieve project goals with the most economical solution.

Financing Mechanisms

Procurement process

    Equity

      Loans

        Grant

          Credit enhancement

            GENERAL ENERGY

            GENERAL INFORMATION

            Energy Use

            Achieving net-zero energy required a design that eliminated waste and maximized the use of renewable energy resources. The building is purposely compact, organized to harvest daylight, solar energy, and cooling breezes to reduce energy needs. The insulated thermal mass of the building and the thermal mass of the water (55°F) passing through the treatment cycle are instrumental in reducing demands upon mechanical systems. During summer months the cool laboratory water has both a cooling and drying effect on the hot humid air entering the building. Efficient geothermal wells and heat pumps provide heat for all spaces. Cooling is only provided for the classroom.

            Sunlight is the primary lighting source. The shape of the building is designed to harvest sunlight via windows, skylights, and shading devices to produce appropriate, comfortable lighting without adversely affecting air temperatures. Electric lighting systems are extremely efficient and controlled to be used only when conditions mandate supplemental light.

            Photovoltaic panels generate more energy than the building utilizes annually, making the OCSL a net-zero energy building. The excess energy is sold to the local utility. During evenings and certain winter periods energy is provided by the electric utility.

            Bioclimatic Design

            Positioned along an east-west axis, the building is oriented for optimal control of daylighting and solar heat gain. Furthermore, the building form and section evolve from the practical need to serve the plants doing the work of wastewater treatment in the engineered biological treatment system. Early research revealed that traditional greenhouse design, while maximizing sunlight for the plants, would not allow for a comfortable environment for workers and visitors to the facility. Recognizing that the plants would reach a light saturation point at around 30,000 lux, the team set a design goal to flatten the amount of light falling on the plants' surfaces during the summer months to this level in order to minimize the heat taken on by the space. (Conversely, during colder months, the amount of light is maximized, which also helps to warm the space.) Solar tracking skylights were installed to aid in this effort.

            Future sunshades along the southern face will bounce sunlight onto the ceiling of the greenhouse, allowing for an even distribution of light and shading the lower portion of glass during the summer months. Roof materials include a combination of vegetation and recycled metal, which help to cool interior spaces, mitigating the heat island effect.

            ENERGY DATASETS

            Dataset NameYearIs DefaultTypePurchased Energy (kBtu/ft²)
            2009-2010 measured data2009NoActual--utility bills-8.26
            DOE-20YesSimulation0.00

            SITE INFORMATION

            GENERAL INFORMATION

            Total Building Site Area196,020 ft²
            Site Description

            The campus lies within the lower Hudson River Valley watershed basin, home to one of the world's most populous areas. The site was formerly a gravel parking lot and the remnants of a dump from a previous use. It was nearly devoid of healthy biodiversity above the ground or within. The new landscape is quite the opposite. Automobiles and waste have been replaced with deep-rooted native plants, a healthy water system, birds, insects and other species. The site is pesticide- and toxin-free.

            The landscape design is regenerative of native site ecology, didactic in form, holistic in function, and above all, provides inspiring landscapes that reflect the ecological and cultural context of the campus. There are four constructed wetland cells that terrace down the southern slope adjacent to the building. As part of the wastewater recycling/treatment process, water passes through the gravel beds within these wetlands and is gradually released into subsurface areas north of the building. The overall effect is colorful and garden-like. The diverse palette of perennial plants provides habitat for a variety of birds and beneficial insects as part of the overall landscape system. Paths provide access to these spaces for learning opportunities.

            Site Conditions
            • Previously developed land

            LAND USE STRATEGIES

            Land Use Description

            Water is a critical issue for the region. The Omega campus is located adjacent to Long Lake, which is part of a tributary system of the Hudson River. Every water system is facing challenges caused by human activities. The issues of the Hudson are well documented and numerous actions are underway to improve the river and its systems. Given the proximity to the population base surrounding New York City, the Hudson is one of the most important bodies of freshwater on the planet. The neighbors surrounding Long Lake, including Omega prior to the construction of the OCSL, are causing degradation of the lake-from agricultural runoff, landscaping chemicals, septic systems, and urban water issues.

            Omega envisioned the OCSL project as a means of thinking globally and acting locally. This began with the decision to clean up and build on the former dump to ensure that leaching or other threats to the aquifer would cease. The innovative natural systems approach of reclaiming water and returning it clean to the local watershed represents a direct approach of reducing the water footprint of every individual who visits the campus, of improving the aquifer and Long Lake locally, and having similarly positive impacts on regional and global water supplies beyond.

            Property Selection
            Property Selection Opportunities
            • Select already-developed sites for new development

            SITE STRATEGIES

            Site Selection
            Siting Analysis
            • Investigate microclimate (specific variations from regional climatic conditions)
            Low-Impact Siting
            • Select an already-developed portion of a site for new development
            Land Development
            Integration with Site Resources
            • Integrate on-site wastewater treatment system with landscape design
            • Provide a constructed wetland for wastewater treatment
            Landscaping
            Ecosystem Restoration
            • Replant damaged sites with native vegetation
            Landscape Plantings
            • Landscape with indigenous vegetation

            WATER

            WATER STRATEGIES

            Landscaping
            Irrigation Systems
            • Recycle graywater for landscape irrigation
            Plumbing Fixtures
            Waterless Fixtures
            • Specify waterless urinals
            Low-Water-Use Fixtures
            • Use low-flow toilets
            Wastewater and Graywater Recycling
            • Design buildings to use treated wastewater for non-potable uses