Advanced Search
Your search resulted in 4 resourcesSort by
This paper documents the methodology developed to identify and reduce plug and process loads (PPLs) as part of NREL's Research Support Facility's (RSF) low energy design process. PPLs, including elevators, kitchen equipment in breakrooms, and office equipment in NREL’s previously occupied office spaces were examined to determine a baseline. This, along with research into the most energy-efficient products and practices, enabled the formulation of a reduction strategy that should yield a 47% reduction in PPLs. The building owner and the design team played equally important roles in developing and implementing opportunities to reduce PPLs. Based on the work done in the RSF, a generalized multistep process has been developed for application to other buildings.