Plug and process loads (PPLs) in commercial buildings account for almost 5% of U.S. primary energy consumption. Minimizing these loads is a primary challenge in the design and operation of an energy-efficient building. PPLs are not related to general lighting, heating, ventilation, cooling, and water heating, and typically do not provide comfort to the occupants. They use an increasingly large fraction of the building energy use pie because the number and variety of electrical devices have increased along with building system efficiency. Reducing PPLs is difficult because energy efficiency opportunities and the equipment needed to address PPL energy use in office spaces are poorly understood.
Advanced Search
Your search resulted in 48 resourcesSort by
This report discusses miscellaneous electrical loads, which are building loads that are not related to general lighting, heating, ventilation, cooling, and water heating, and typically do not provide comfort to the occupants. MELs in commercial buildings account for almost 5% of U.S. primary energy consumption.
This report describes the psychrometric bin analysis that was conducted for the ASHRAE recommended and allowable operating environment zones as well as a modified allowable operating environment, discusses control strategies, and presents examples of energy-efficient data centers using alternative cooling strategies.
This case study describes the National Renewable Energy Laboratory's (NREL) data center as a showcase of energy efficiency. Most of what NREL has done can be replicated by clients; however, two design approaches are climate-dependent: near-full reliance on outside air for cooling, and photovoltaic arrays for power.
In typical computer centers you can feel the energy consumption from racks of servers radiating heat, while icy air blows through the room to cool them. NREL’s fully contained hot and cold aisle data center configuration minimizes this problem. The configuration includes effective air-side economizer cooling with an evaporative boost when needed.
This checklist packet is a team-focused guide to realizing energy savings in high-performance office buildings through carefully considered lighting and control design. The checklists should be distributed among the integrated project team, including the owner, lighting designer and engineer, commissioning agent, and facility manager, at the beginning of a project and referred to regularly during design meetings and drawing reviews.
Conventional information technology (IT) equipment and data center spaces can consume more than 100 times the energy of standard office spaces, so the potential for energy savings is huge. You can use this application guide to reduce your equipment energy consumption in any building with a data center, server closets, or other IT equipment (computers, printers, etc.). Some of these strategies are most effective at the beginning of the design process; others can be implemented at any time and be sequenced as part of the normal procurement and replacement schedule.