This paper illustrates the challenges of integrating rigorous daylight and electric lighting simulation data with whole-building energy models, and defends the need for such integration in order to achieve aggressive energy savings in building designs. Through a case study example, we examine the ways daylighting – and daylighting simulation – drove the design of a large net-zero energy project.
Advanced Search
Your search resulted in 2 resourcesSort by
January 2011
The California Energy Commission’s Public Interest Energy Research (PIER) Program sponsors the development and demonstration of energy-efficient building technologies. Over the past several years, PIER has developed strategic partnerships with the University of California, California State University, California Community Colleges, and California Department of General Services. These partnerships include a series of demonstration projects coupled with programmatic support to ensure continued deployment of energy-efficient technologies and practices across California. Examples of the latest energy-efficient innovations are described.
Refine your search
topic
- Energy Efficiency (2) Apply Energy Efficiency filter
- Heating, Ventilation, and Air Conditioning (HVAC) (2) Apply Heating, Ventilation, and Air Conditioning (HVAC) filter
- Lighting (2) Apply Lighting filter
- Analysis, Benchmarking, Performance, and Monitoring (1) Apply Analysis, Benchmarking, Performance, and Monitoring filter
- Daylighting (1) Apply Daylighting filter
- Building Envelope (1) Apply Building Envelope filter
- Miscellaneous Electric Loads (1) Apply Miscellaneous Electric Loads filter
- Operations and Maintenance (1) Apply Operations and Maintenance filter
- Whole Building Design (1) Apply Whole Building Design filter
building type
- Office (38) Apply Office filter
- Applies to All Building Types (20) Apply Applies to All Building Types filter
- Mercantile (Detached/Standalone) (6) Apply Mercantile (Detached/Standalone) filter
- Datacenter (5) Apply Datacenter filter
- Parking Garage (5) Apply Parking Garage filter
- Other (5) Apply Other filter
- Food Sales (4) Apply Food Sales filter
- Food Service (4) Apply Food Service filter
- Mercantile (Enclosed and Strip Malls) (4) Apply Mercantile (Enclosed and Strip Malls) filter
- Warehouse and Storage (4) Apply Warehouse and Storage filter
- Health Care (Inpatient) (3) Apply Health Care (Inpatient) filter
- Health Care (Outpatient) (3) Apply Health Care (Outpatient) filter
- K-12 Education (3) Apply K-12 Education filter
- Lodging (3) Apply Lodging filter
- Manufacturing/Industrial Facility (3) Apply Manufacturing/Industrial Facility filter
- Public Assembly (3) Apply Public Assembly filter
- Public Order and Safety (3) Apply Public Order and Safety filter
- Religious Worship (3) Apply Religious Worship filter
- (-) Remove Higher Education filter Higher Education
- Multifamily Housing (2) Apply Multifamily Housing filter
- Vacant (2) Apply Vacant filter
- Wastewater Plant (2) Apply Wastewater Plant filter
audience type
- Energy and Facility Management (2) Apply Energy and Facility Management filter
- Owners (2) Apply Owners filter
- Architectural and Engineering (1) Apply Architectural and Engineering filter
- Construction and Building Contracting (1) Apply Construction and Building Contracting filter
- Energy Modeling (1) Apply Energy Modeling filter
primary institution
collection
- Energy-Performance-Based Acquisition in Commercial Buildings (6) Apply Energy-Performance-Based Acquisition in Commercial Buildings filter
- Energy-Performance-Based Acquisition: Develop Energy Performance Goals (4) Apply Energy-Performance-Based Acquisition: Develop Energy Performance Goals filter
- Commercial Building Partnerships (3) Apply Commercial Building Partnerships filter
- Training: Building Retuning (3) Apply Training: Building Retuning filter
- Planning and Financing K-12 Energy Efficiency (2) Apply Planning and Financing K-12 Energy Efficiency filter
- Zero Energy Buildings (2) Apply Zero Energy Buildings filter
- (-) Remove UC Davis Case Studies filter UC Davis Case Studies
- Energy-Performance-Based Acquisition: Define a Performance-Based Acquisition Process (1) Apply Energy-Performance-Based Acquisition: Define a Performance-Based Acquisition Process filter
- Energy-Performance-Based Acquisition: Require Energy Performance (1) Apply Energy-Performance-Based Acquisition: Require Energy Performance filter
- (-) Remove Energy-Performance-Based Acquisition: Manage a Performance-based Acquisition Process filter Energy-Performance-Based Acquisition: Manage a Performance-based Acquisition Process
- Advanced Energy Design Guides (0) Apply Advanced Energy Design Guides filter
- (-) Remove Advanced Energy Retrofit Guides filter Advanced Energy Retrofit Guides
- Energy-Performance-Based Acquisition: Verify Energy Performance (0) Apply Energy-Performance-Based Acquisition: Verify Energy Performance filter
- Energy-Performance-Based Acquisition: Goal-Based Acquisition Case Studies (0) Apply Energy-Performance-Based Acquisition: Goal-Based Acquisition Case Studies filter
- Advanced Rooftop Unit Campaign (0) Apply Advanced Rooftop Unit Campaign filter
- Financing Solutions (0) Apply Financing Solutions filter
- Policies and Programs (0) Apply Policies and Programs filter
- Energy Technologies (0) Apply Energy Technologies filter
- (-) Remove Plug and Process Loads: Energy-Saving Resources filter Plug and Process Loads: Energy-Saving Resources
- Energy-Performance-Based Acquisition: Annotated RFPs (0) Apply Energy-Performance-Based Acquisition: Annotated RFPs filter
- Advanced Energy Design Guides - Models (0) Apply Advanced Energy Design Guides - Models filter
- Zero Energy for Federal Buildings: Define Net Zero (0) Apply Zero Energy for Federal Buildings: Define Net Zero filter
- (-) Remove Zero Energy for Federal Buildings: Establish Energy Efficiency System Best Practices filter Zero Energy for Federal Buildings: Establish Energy Efficiency System Best Practices
- Zero Energy for Federal Buildings: Establish Renewable Energy System Integration Process (0) Apply Zero Energy for Federal Buildings: Establish Renewable Energy System Integration Process filter
- Zero Energy for Federal Buildings: Establish Zero Energy Building Operations Plan (0) Apply Zero Energy for Federal Buildings: Establish Zero Energy Building Operations Plan filter
- Zero Energy for Federal Buildings: Verify and Report Zero Energy Building Performance (0) Apply Zero Energy for Federal Buildings: Verify and Report Zero Energy Building Performance filter
- Resources for Small Commercial Buildings (0) Apply Resources for Small Commercial Buildings filter
- Refrigeration Playbook Tools (0) Apply Refrigeration Playbook Tools filter
construction type
phase of delivery
- Scoping and Predesign (1) Apply Scoping and Predesign filter
- Procurement (1) Apply Procurement filter
- Conceptual Design (1) Apply Conceptual Design filter
- Construction (1) Apply Construction filter
- Commissioning (1) Apply Commissioning filter
- Operations, Maintenance, Measurement, and Verification (1) Apply Operations, Maintenance, Measurement, and Verification filter
- Design (1) Apply Design filter