Your search resulted in 10 resources

Sort by

  • Title
  • Best Match

Controlling Capital Costs in High-Performance Buildings Using a Performance Based Design-Build Process

October 2011

This presentation discusses the importance of selecting a project delivery method that balances performance, best value, and cost savings.

Download
Read more

NREL's Research Support Facility: An Energy Performance Update

August 2011

The Research Support Facility complex (RSF, RSF II, parking garage, and associated site lighting) was designed to produce more on-site renewable energy than it uses over the course of a typical weather year, when accounted for at the site. To date, the end use performance monitoring and verification suggests that when the RSF complex is fully built out, we will meet the annual energy use goals. Continued performance monitoring and occupant education are required to ensure annual energy use goals will continue to be met.

Download
Read more

Research Support Facility Workshop Session II: Performance-Based Design-Build Process

June 2012

This presentation Session II from the RSF Workshop discusses the performance-based design-build process, which was used to procure and construct the Research Support Facility.

Download
Read more

Controlling Capital Costs in High Performance Office Buildings: 15 Best Practices for Overcoming Cost Barriers in Project Acquisition, Design, and Construction

October 2011

This guide presents a set of 15 best practices for owners, designers, and construction teams to reach high-performance goals and maintain a competitive budget. They are based on the recent experiences of the Research Support Facility owner and design-build team, and show that achieving this outcome requires that all key integrated team members understand their opportunities to control capital costs.

Download
Read more

Moving K-12 Zero Energy Schools to the Mainstream: Establishing Design Guidelines and Energy Targets

August 2018

K–12 schools are ideal candidates to lead the market shift from buildings that consume energy to buildings that produce as much renewable energy as they use. There are now resources to guide owners and project teams as they make the shift to these “zero energy” buildings, notably the Advanced Energy Design Guide for K–12 School Buildings: Achieving Zero Energy (K–12 ZE AEDG).

This 10-page paper provides a concise overview of the K–12 ZE AEDG (200 pages), as well as a nice explanation of the energy modeling and analysis methodology used to create the Design Guide.

Download
Read more

A Handbook for Conducting Charrettes for High-Performance Projects

June 2011

The purpose of this handbook is to furnish guidance for planning and conducting a highperformance building charrette, sometimes called a "greening charrette." The handbook answers typical questions such as, "What is a charrette?", "Why conduct a charrette?", "What topics should we cover?", "Whom should we invite?" and "What happens after the charrette?". Owners, design team leaders, site planners, state energy office staff, and others who believe a charrette will benefit their projects will find the handbook helpful.

Download
Read more

Using an Energy Performance Based Design-Build Process to Procure a Large Scale Low-Energy Building

May 2011

This paper reviews the novel procurement, acquisition, and contract process of a large-scale replicable net zero energy (ZEB) office building. The owners (who are also commercial building energy efficiency researchers) developed and implemented an energy performance based design-build process to procure an office building with contractual requirements to meet demand side energy and LEED goals. The key procurement steps needed to ensure achievement of the energy efficiency and ZEB goals using a replicable delivery process are outlined.

Download
Read more

Energy Use Intensity and its Influence on the Integrated Daylighting Design of a Large Net Zero Energy Building

February 2011

Low energy or high-performance buildings form a vital component in the sustainable future of building design and construction. Rigorous integrated daylighting design and simulation will be critical to their success as energy efficiency becomes a requirement, because electric lighting usually represents a large fraction of the energy consumed. We present the process and tools used to design the lighting systems in the newest building at the National Renewable Energy Laboratory (NREL), the Research Support Facility (RSF). Daylighting had to be integrated with the electric lighting, as low energy use (50% below ASHRAE 90.1-2004) and the LEED daylight credit were contractually required, with a reach goal of being a net-zero energy building (NZEB). The oft-ignored disconnect between lighting simulation and whole-building energy use simulation had to be addressed, as ultimately all simulation efforts had to translate to energy use intensity predictions, design responses, and preconstruction substantiation of the design. We present preliminary data from the postoccupancy monitoring efforts with an eye toward the current efficacy of energy and lighting simulation methodologies.

Download
Read more

Adaptive Corridors: Latham Square Office Building

August 2012

Energy savings can be achieved in corridors and other secondary spaces with an occupancy-based adaptive lighting system. Such a system is generally composed of occupancy sensors, dimmable ballasts and a communication platform. The system automatically lowers light levels to the minimum footcandles required by safety codes during vacancy and raises light output to the recommended level for occupant comfort during occupied periods. The adaptive lighting system installed at the Latham Square office building is based on Lutron’s Energi TriPak solution, a stand-alone platform for adaptive lighting that employs cost-effective wireless control devices and programmable dimming ballasts.

Download
Read more

Integrated Office Lighting System: Mrak Hall, UC Davis

December 2011

The California Lighting Technology Center partnered with Finelite, Inc. and Adura Technologies to develop and demonstrate a unique, wireless task/ambient office lighting solution ideally suited for the retrofit market. The system consists of two key elements: a task/ambient lighting system and advanced, wireless lighting controls. The combination substantially reduce energy use and improves lighting quality, and provides personal lighting control for individual work spaces, and does not require additional wiring or rewiring of existing luminaries or lighting circuits. The system has three specific components: adaptive ambient lighting, light-emitting diode task lighting, and wireless controls.

Download
Read more

Refine your search

clear all filters

resource type

  • Presentation (3) Apply Presentation filter
  • Case Study (2) Apply Case Study filter
  • Conference Paper (2) Apply Conference Paper filter
  • How-To Guide (1) Apply How-To Guide filter
  • Report (1) Apply Report filter

topic

  • Analysis, Benchmarking, Performance, and Monitoring (9) Apply Analysis, Benchmarking, Performance, and Monitoring filter
  • Lighting (8) Apply Lighting filter
  • Whole Building Design (8) Apply Whole Building Design filter
  • Daylighting (7) Apply Daylighting filter
  • Energy Efficiency (7) Apply Energy Efficiency filter
  • Building Envelope (7) Apply Building Envelope filter
  • Heating, Ventilation, and Air Conditioning (HVAC) (7) Apply Heating, Ventilation, and Air Conditioning (HVAC) filter
  • Miscellaneous Electric Loads (7) Apply Miscellaneous Electric Loads filter
  • Operations and Maintenance (7) Apply Operations and Maintenance filter
  • Sensors and Controls (1) Apply Sensors and Controls filter

building type

  • Office (9) Apply Office filter
  • K-12 Education (2) Apply K-12 Education filter
  • Datacenter (1) Apply Datacenter filter
  • Food Sales (1) Apply Food Sales filter
  • Food Service (1) Apply Food Service filter
  • Health Care (Inpatient) (1) Apply Health Care (Inpatient) filter
  • Health Care (Outpatient) (1) Apply Health Care (Outpatient) filter
  • Higher Education (1) Apply Higher Education filter
  • Lodging (1) Apply Lodging filter
  • Manufacturing/Industrial Facility (1) Apply Manufacturing/Industrial Facility filter
  • Mercantile (Enclosed and Strip Malls) (1) Apply Mercantile (Enclosed and Strip Malls) filter
  • Mercantile (Detached/Standalone) (1) Apply Mercantile (Detached/Standalone) filter
  • Multifamily Housing (1) Apply Multifamily Housing filter
  • Parking Garage (1) Apply Parking Garage filter
  • Public Assembly (1) Apply Public Assembly filter
  • Public Order and Safety (1) Apply Public Order and Safety filter
  • Religious Worship (1) Apply Religious Worship filter
  • Vacant (1) Apply Vacant filter
  • Warehouse and Storage (1) Apply Warehouse and Storage filter
  • Wastewater Plant (1) Apply Wastewater Plant filter
  • Other (1) Apply Other filter

audience type

  • Owners (62) Apply Owners filter
  • Energy and Facility Management (51) Apply Energy and Facility Management filter
  • Construction and Building Contracting (36) Apply Construction and Building Contracting filter
  • Architectural and Engineering (22) Apply Architectural and Engineering filter
  • Educators and Trainers (10) Apply Educators and Trainers filter
  • (-) Remove Energy Modeling filter Energy Modeling
  • Applies to All Audience Types (9) Apply Applies to All Audience Types filter
  • Utilities and Program Administrators (7) Apply Utilities and Program Administrators filter
  • Government: Local (7) Apply Government: Local filter
  • Financing and Investment (5) Apply Financing and Investment filter
  • Government: Federal (4) Apply Government: Federal filter
  • Government: Policymakers (4) Apply Government: Policymakers filter
  • Government: Program Administrators (4) Apply Government: Program Administrators filter
  • Academic (3) Apply Academic filter
  • Government: State (3) Apply Government: State filter
  • Tenants (2) Apply Tenants filter
  • Government: Tribal (1) Apply Government: Tribal filter

primary institution

  • NREL (8) Apply NREL filter
  • Other (2) Apply Other filter

collection

  • Energy-Performance-Based Acquisition in Commercial Buildings (50) Apply Energy-Performance-Based Acquisition in Commercial Buildings filter
  • Energy-Performance-Based Acquisition: Manage a Performance-based Acquisition Process (28) Apply Energy-Performance-Based Acquisition: Manage a Performance-based Acquisition Process filter
  • Energy-Performance-Based Acquisition: Require Energy Performance (22) Apply Energy-Performance-Based Acquisition: Require Energy Performance filter
  • Energy-Performance-Based Acquisition: Develop Energy Performance Goals (16) Apply Energy-Performance-Based Acquisition: Develop Energy Performance Goals filter
  • Energy-Performance-Based Acquisition: Verify Energy Performance (16) Apply Energy-Performance-Based Acquisition: Verify Energy Performance filter
  • Energy-Performance-Based Acquisition: Goal-Based Acquisition Case Studies (11) Apply Energy-Performance-Based Acquisition: Goal-Based Acquisition Case Studies filter
  • (-) Remove Energy-Performance-Based Acquisition: Define a Performance-Based Acquisition Process filter Energy-Performance-Based Acquisition: Define a Performance-Based Acquisition Process
  • Plug and Process Loads: Energy-Saving Resources (6) Apply Plug and Process Loads: Energy-Saving Resources filter
  • Advanced Energy Design Guides - Models (4) Apply Advanced Energy Design Guides - Models filter
  • Commercial Building Partnerships (3) Apply Commercial Building Partnerships filter
  • Zero Energy Buildings (3) Apply Zero Energy Buildings filter
  • Advanced Energy Design Guides (2) Apply Advanced Energy Design Guides filter
  • (-) Remove UC Davis Case Studies filter UC Davis Case Studies
  • (-) Remove Planning and Financing K-12 Energy Efficiency filter Planning and Financing K-12 Energy Efficiency
  • (-) Remove Advanced Energy Retrofit Guides filter Advanced Energy Retrofit Guides
  • Training: Building Retuning (0) Apply Training: Building Retuning filter
  • Advanced Rooftop Unit Campaign (0) Apply Advanced Rooftop Unit Campaign filter
  • Financing Solutions (0) Apply Financing Solutions filter
  • Policies and Programs (0) Apply Policies and Programs filter
  • Energy Technologies (0) Apply Energy Technologies filter
  • Energy-Performance-Based Acquisition: Annotated RFPs (0) Apply Energy-Performance-Based Acquisition: Annotated RFPs filter
  • Zero Energy for Federal Buildings: Define Net Zero (0) Apply Zero Energy for Federal Buildings: Define Net Zero filter
  • Zero Energy for Federal Buildings: Establish Energy Efficiency System Best Practices (0) Apply Zero Energy for Federal Buildings: Establish Energy Efficiency System Best Practices filter
  • Zero Energy for Federal Buildings: Establish Renewable Energy System Integration Process (0) Apply Zero Energy for Federal Buildings: Establish Renewable Energy System Integration Process filter
  • Zero Energy for Federal Buildings: Establish Zero Energy Building Operations Plan (0) Apply Zero Energy for Federal Buildings: Establish Zero Energy Building Operations Plan filter
  • Zero Energy for Federal Buildings: Verify and Report Zero Energy Building Performance (0) Apply Zero Energy for Federal Buildings: Verify and Report Zero Energy Building Performance filter
  • (-) Remove Resources for Small Commercial Buildings filter Resources for Small Commercial Buildings
  • Refrigeration Playbook Tools (0) Apply Refrigeration Playbook Tools filter

construction type

  • New Construction (7) Apply New Construction filter
  • Existing/Retrofit (2) Apply Existing/Retrofit filter

phase of delivery

  • Scoping and Predesign (7) Apply Scoping and Predesign filter
  • Procurement (7) Apply Procurement filter
  • Conceptual Design (7) Apply Conceptual Design filter
  • Construction (7) Apply Construction filter
  • Commissioning (7) Apply Commissioning filter
  • Operations, Maintenance, Measurement, and Verification (7) Apply Operations, Maintenance, Measurement, and Verification filter
  • Design (7) Apply Design filter
  • Applies to All Phases of Delivery (1) Apply Applies to All Phases of Delivery filter

state

  • CO (7) Apply CO filter
  • CA (2) Apply CA filter

publication date

  • 2011 (7) Apply 2011 filter
  • 2012 (2) Apply 2012 filter
  • 2018 (1) Apply 2018 filter

Contacts | Web Site Policies | U.S. Department of Energy | USA.gov