Skip to main content
  • EERE Home
  • Programs & Offices
  • Consumer Information
Commercial Buildings Resource Database
  • EERE
  • »
  • Building Technologies Office
  • »
  • Commercial Buildings Resource Database
Share

Advanced Search

Your search resulted in 50 resources

Sort by

  • sort descendingTitle
  • Best Match

A Handbook for Conducting Charrettes for High-Performance Projects

June 2011

The purpose of this handbook is to furnish guidance for planning and conducting a highperformance building charrette, sometimes called a "greening charrette." The handbook answers typical questions such as, "What is a charrette?", "Why conduct a charrette?", "What topics should we cover?", "Whom should we invite?" and "What happens after the charrette?". Owners, design team leaders, site planners, state energy office staff, and others who believe a charrette will benefit their projects will find the handbook helpful.

Download
Read more

ASHRAE Journal Article: Getting to Net Zero

September 2009

It is still early in the collection and analysis of energy performance data, but it is already clear that high-performance commercial buildings—some "almost net-zero buildings"—can be constructed cost effectively, providing productive environments for occupants, reducing operating costs, and enhancing the competitiveness of commercial properties.

Download
Read more

Assessing and Reducing Plug and Process Loads in Commercial Office and Retail Buildings

November 2011

Plug and process loads in commercial buildings account for 5% of U.S. primary energy consumption. Minimizing these loads is a primary challenge in the design and operation of an energy-efficient building.

Download
Read more

Assessing and Reducing Plug and Process Loads in Office Buildings

April 2013

Plug and process loads (PPLs) in commercial buildings account for almost 5% of U.S. primary energy consumption. Minimizing these loads is a primary challenge in the design and operation of an energy-efficient building. PPLs are not related to general lighting, heating, ventilation, cooling, and water heating, and typically do not provide comfort to the occupants. They use an increasingly large fraction of the building energy use pie because the number and variety of electrical devices have increased along with building system efficiency. Reducing PPLs is difficult because energy efficiency opportunities and the equipment needed to address PPL energy use in office spaces are poorly understood.

Download
Read more

Building a Better Data Center

March 2011

This presentation decribes how building an energy-efficient data center can improve a business's bottom line.

Download
Read more

Controlling Capital Costs in High Performance Office Buildings: 15 Best Practices for Overcoming Cost Barriers in Project Acquisition, Design, and Construction

May 2012

This report presents a set of 15 best practices for owners, designers, and construction teams to reach high-performance goals and maintain a competitive budget. These best practices are based on the recent experiences of the Research Support Facility owner and design-build team for the Research Support Facility (RSF) on the National Renewable Energy Laboratory’s (NREL) campus in Golden, Colorado, and show that achieving this high performance outcomes requires that all key integrated team members understand their opportunities to control capital costs.

Download
Read more

Controlling Capital Costs in High Performance Office Buildings: 15 Best Practices for Overcoming Cost Barriers in Project Acquisition, Design, and Construction

October 2011

This guide presents a set of 15 best practices for owners, designers, and construction teams to reach high-performance goals and maintain a competitive budget. They are based on the recent experiences of the Research Support Facility owner and design-build team, and show that achieving this outcome requires that all key integrated team members understand their opportunities to control capital costs.

Download
Read more

Controlling Capital Costs in High Performance Office Buildings: A Review of Best Practices for Overcoming Cost Barriers

August 2012

First costs, or capital costs, for energy efficiency strategies in office buildings are often a primary barrier to realizing high-performance buildings with 50% or greater energy savings. Historically, the industry has been unable to reach deep energy savings because of a reliance on energy cost savings and simple payback analysis alone to justify investments. A more comprehensive and integrated cost justification and capital cost control approach is needed. By implementing innovative procurement and delivery strategies, integrated design principles and cost tradeoffs, life cycle cost justifications, and streamlined construction methods, first cost barriers can be overcome. It is now possible to attain marketable, high-performance office buildings that achieve LEED Platinum and reach net zero energy goals at competitive whole building first costs, as illustrated by the U.S. Department of Energy’s and National Renewable Energy Laboratory’s latest high-performance office building, the Research Support Facility (RSF) on the National Renewable Energy Laboratory campus in Golden, Colorado.

Download
Read more

Controlling Capital Costs in High-Performance Buildings Using a Performance Based Design-Build Process

October 2011

This presentation discusses the importance of selecting a project delivery method that balances performance, best value, and cost savings.

Download
Read more

Cost Control Strategies for Zero Energy Buildings: High-Performance Design and Construction on a Budget

September 2014

There is mounting evidence that zero energy can, in many cases, be achieved within typical construction budgets. To ensure that the momentum behind zero energy buildings and other low-energy buildings will continue to grow, this guide assembles recommendations for replicating specific successes of early adopters who have met their energy goals while controlling costs. Contents include: discussion of recommended cost control strategies, which are grouped by project phase (acquisition and delivery, design, and construction) and accompanied by industry examples; recommendations for balancing key decision-making factors; and quick reference tables that can help teams apply strategies to specific projects.

Download
Read more

Pages

  • 1
  • 2
  • 3
  • 4
  • 5
  • next ›
  • last »

Refine your search

clear all filters

resource type

  • Presentation (11) Apply Presentation filter
  • Fact Sheet (10) Apply Fact Sheet filter
  • Report (8) Apply Report filter
  • Article (6) Apply Article filter
  • Conference Paper (5) Apply Conference Paper filter
  • How-To Guide (5) Apply How-To Guide filter
  • Case Study (4) Apply Case Study filter
  • Technical Report (1) Apply Technical Report filter

topic

  • Energy Efficiency (50) Apply Energy Efficiency filter
  • Whole Building Design (50) Apply Whole Building Design filter
  • Analysis, Benchmarking, Performance, and Monitoring (48) Apply Analysis, Benchmarking, Performance, and Monitoring filter
  • Daylighting (48) Apply Daylighting filter
  • Building Envelope (48) Apply Building Envelope filter
  • Heating, Ventilation, and Air Conditioning (HVAC) (48) Apply Heating, Ventilation, and Air Conditioning (HVAC) filter
  • Lighting (48) Apply Lighting filter
  • Miscellaneous Electric Loads (48) Apply Miscellaneous Electric Loads filter
  • Operations and Maintenance (48) Apply Operations and Maintenance filter
  • Renewable Energy: General (2) Apply Renewable Energy: General filter
  • Energy Planning (2) Apply Energy Planning filter

building type

  • Office (47) Apply Office filter
  • Datacenter (8) Apply Datacenter filter
  • Parking Garage (7) Apply Parking Garage filter
  • Food Sales (6) Apply Food Sales filter
  • Food Service (6) Apply Food Service filter
  • Health Care (Inpatient) (6) Apply Health Care (Inpatient) filter
  • Health Care (Outpatient) (6) Apply Health Care (Outpatient) filter
  • Higher Education (6) Apply Higher Education filter
  • K-12 Education (6) Apply K-12 Education filter
  • Lodging (6) Apply Lodging filter
  • Manufacturing/Industrial Facility (6) Apply Manufacturing/Industrial Facility filter
  • Mercantile (Enclosed and Strip Malls) (6) Apply Mercantile (Enclosed and Strip Malls) filter
  • Mercantile (Detached/Standalone) (6) Apply Mercantile (Detached/Standalone) filter
  • Multifamily Housing (6) Apply Multifamily Housing filter
  • Public Assembly (6) Apply Public Assembly filter
  • Public Order and Safety (6) Apply Public Order and Safety filter
  • Religious Worship (6) Apply Religious Worship filter
  • Vacant (6) Apply Vacant filter
  • Warehouse and Storage (6) Apply Warehouse and Storage filter
  • Wastewater Plant (6) Apply Wastewater Plant filter
  • Other (6) Apply Other filter
  • Applies to All Building Types (2) Apply Applies to All Building Types filter

audience type

  • Architectural and Engineering (50) Apply Architectural and Engineering filter
  • Construction and Building Contracting (50) Apply Construction and Building Contracting filter
  • Owners (50) Apply Owners filter
  • Energy and Facility Management (48) Apply Energy and Facility Management filter
  • Energy Modeling (48) Apply Energy Modeling filter
  • Educators and Trainers (2) Apply Educators and Trainers filter

primary institution

  • (-) Remove NREL filter NREL

collection

  • (-) Remove Energy-Performance-Based Acquisition in Commercial Buildings filter Energy-Performance-Based Acquisition in Commercial Buildings
  • Energy-Performance-Based Acquisition: Manage a Performance-based Acquisition Process (27) Apply Energy-Performance-Based Acquisition: Manage a Performance-based Acquisition Process filter
  • Energy-Performance-Based Acquisition: Require Energy Performance (22) Apply Energy-Performance-Based Acquisition: Require Energy Performance filter
  • Energy-Performance-Based Acquisition: Develop Energy Performance Goals (16) Apply Energy-Performance-Based Acquisition: Develop Energy Performance Goals filter
  • Energy-Performance-Based Acquisition: Verify Energy Performance (15) Apply Energy-Performance-Based Acquisition: Verify Energy Performance filter
  • Energy-Performance-Based Acquisition: Goal-Based Acquisition Case Studies (11) Apply Energy-Performance-Based Acquisition: Goal-Based Acquisition Case Studies filter
  • Energy-Performance-Based Acquisition: Define a Performance-Based Acquisition Process (9) Apply Energy-Performance-Based Acquisition: Define a Performance-Based Acquisition Process filter
  • Plug and Process Loads: Energy-Saving Resources (5) Apply Plug and Process Loads: Energy-Saving Resources filter
  • Zero Energy Buildings (2) Apply Zero Energy Buildings filter
  • Advanced Energy Design Guides (0) Apply Advanced Energy Design Guides filter
  • (-) Remove Advanced Energy Retrofit Guides filter Advanced Energy Retrofit Guides
  • Commercial Building Partnerships (0) Apply Commercial Building Partnerships filter
  • (-) Remove UC Davis Case Studies filter UC Davis Case Studies
  • Training: Building Retuning (0) Apply Training: Building Retuning filter
  • Planning and Financing K-12 Energy Efficiency (0) Apply Planning and Financing K-12 Energy Efficiency filter
  • Advanced Rooftop Unit Campaign (0) Apply Advanced Rooftop Unit Campaign filter
  • Financing Solutions (0) Apply Financing Solutions filter
  • Policies and Programs (0) Apply Policies and Programs filter
  • Energy Technologies (0) Apply Energy Technologies filter
  • Energy-Performance-Based Acquisition: Annotated RFPs (0) Apply Energy-Performance-Based Acquisition: Annotated RFPs filter
  • Advanced Energy Design Guides - Models (0) Apply Advanced Energy Design Guides - Models filter
  • Zero Energy for Federal Buildings: Define Net Zero (0) Apply Zero Energy for Federal Buildings: Define Net Zero filter
  • Zero Energy for Federal Buildings: Establish Energy Efficiency System Best Practices (0) Apply Zero Energy for Federal Buildings: Establish Energy Efficiency System Best Practices filter
  • Zero Energy for Federal Buildings: Establish Renewable Energy System Integration Process (0) Apply Zero Energy for Federal Buildings: Establish Renewable Energy System Integration Process filter
  • Zero Energy for Federal Buildings: Establish Zero Energy Building Operations Plan (0) Apply Zero Energy for Federal Buildings: Establish Zero Energy Building Operations Plan filter
  • Zero Energy for Federal Buildings: Verify and Report Zero Energy Building Performance (0) Apply Zero Energy for Federal Buildings: Verify and Report Zero Energy Building Performance filter
  • Resources for Small Commercial Buildings (0) Apply Resources for Small Commercial Buildings filter
  • Refrigeration Playbook Tools (0) Apply Refrigeration Playbook Tools filter

construction type

  • New Construction (50) Apply New Construction filter

phase of delivery

  • Scoping and Predesign (50) Apply Scoping and Predesign filter
  • Procurement (50) Apply Procurement filter
  • Conceptual Design (50) Apply Conceptual Design filter
  • (-) Remove Construction filter Construction
  • Design (50) Apply Design filter
  • Commissioning (48) Apply Commissioning filter
  • Operations, Maintenance, Measurement, and Verification (48) Apply Operations, Maintenance, Measurement, and Verification filter
  • Renovation and Retrofit (2) Apply Renovation and Retrofit filter

state

  • CO (48) Apply CO filter

publication date

  • 2011 (23) Apply 2011 filter
  • 2010 (9) Apply 2010 filter
  • 2012 (8) Apply 2012 filter
  • 2013 (4) Apply 2013 filter
  • 2009 (3) Apply 2009 filter
  • 2014 (2) Apply 2014 filter
  • 2006 (1) Apply 2006 filter
  • 2008 (1) Apply 2008 filter

Contacts | Web Site Policies | U.S. Department of Energy | USA.gov