A case study of the overview, process, and results of the re-tuning that was conducted in a building in Arlington, Virginia by Vornado Realty Trust in October 2012. Re-tuning provided the facilities management team with the ability to identify and understand building scheduling opportunities that drove significant, low-cost energy savings. Five measures were conducted, many of which pertained to the HVAC system.
Advanced Search
Your search resulted in 25 resourcesSort by
Re-tune the building based on specific findings. Building re-tuning maxims, assumptions, and conclusions.
Part 10 of a 10 part Building Re-tuning training material.
Entire program is at http://buildingretuning.pnnl.gov/training.stm
Understand the purpose of re-tuning, definition of building re-tuning, and what to expect from the training class
Part one of a 10 part Building Re-tuning training material.
Entire program is at http://buildingretuning.pnnl.gov/training.stm
Understand that re-tuning is the process of learning about a building and then making incremental adjustments to achieve more desirable results.
Part 2 of a 10 part Building Re-tuning training material.
Entire program is at http://buildingretuning.pnnl.gov/training.stm
A guide to understand the information needed to re-tune a building
Part 3 of a 10 part Building Re-tuning training material.
Entire program is at http://buildingretuning.pnnl.gov/training.stm
Detect potential operational problems even before visiting the building. Identify problems that require time histories to detect – incorrect schedules, no use of set back during unoccupied modes, poor economizer operation. Understand how to use the Energy Charting and Metrics (ECAM) tool
Part 4 of a 10 part Building Re-tuning training material.
Entire program is at http://buildingretuning.pnnl.gov/training.stm
Learn how to re-tune air-handling units (AHUs)
Part 5 of a 10 part Building Re-tuning training material.
Entire program is at http://buildingretuning.pnnl.gov/training.stm
A guide to understand economizer operations as it relates to re-tuning or determining whether air-side economizers are operating properly.
Part 6 of a 10 part Building Re-tuning training material.
Entire program is at http://buildingretuning.pnnl.gov/training.stm
Understand re-tuning for central utility plants including boiler and chiller operation issues.
Part 8 of a 10 part Building Re-tuning training material.
Entire program is at http://buildingretuning.pnnl.gov/training.stm
Understand how to conduct a thorough building "walk down" for a re-tuning effort. Purpose being to develop a general impression of: overall building condition, overall building design, HVAC system design. Also to collect some basic data on the building systems at a level of detail greater than the initial data collection and to confirm/verify issues or problems identified through trend analysis.
Part 9 of a 10 part Building Re-tuning training material.
Entire program is at http://buildingretuning.pnnl.gov/training.stm