Advanced Search
Your search resulted in 22 resourcesSort by
The Research Support Facility complex (RSF, RSF II, parking garage, and associated site lighting) was designed to produce more on-site renewable energy than it uses over the course of a typical weather year, when accounted for at the site. To date, the end use performance monitoring and verification suggests that when the RSF complex is fully built out, we will meet the annual energy use goals. Continued performance monitoring and occupant education are required to ensure annual energy use goals will continue to be met.
An energy-efficient data center includes targets for its power usage effectiveness (<1.2) and energy resource efficiency (< 0.9). It should be designed with hot isle–cold isle separation, use free cooling (economizer) and evaporative cooling when available, minimize fan energy, and use the most energy-efficient equipment possible.
This paper illustrates the challenges of integrating rigorous daylight and electric lighting simulation data with whole-building energy models, and defends the need for such integration in order to achieve aggressive energy savings in building designs. Through a case study example, we examine the ways daylighting – and daylighting simulation – drove the design of a large net-zero energy project.
This paper reviews the novel procurement, acquisition, and contract process of a large-scale replicable net zero energy (ZEB) office building. The owners (who are also commercial building energy efficiency researchers) developed and implemented an energy performance based design-build process to procure an office building with contractual requirements to meet demand side energy and LEED goals. The key procurement steps needed to ensure achievement of the energy efficiency and ZEB goals using a replicable delivery process are outlined.