This 150,000 SF, LEED Gold, Net Zero facility was built on a 17.5 acre site in the city of Irving, Texas. Project cost was $29,610,423, and construction commenced on May 14, 2010. The project opened its doors for school on August 24, 2011. The building is structural steel frame with a brick and metal panel veneer. There are large expanses of windows for daylight harvesting. There are two stories consisting of classrooms, library, cafeteria, auditorium, and gymnasium. The structure fits on a very tight site with building orientation critical to energy conservation; native landscaping and pervious paving round out the exterior. The school uses extensive shading to minimize solar heat gain and incorporates wind turbines as a part of its onsite renewable energy generation portfolio.